{"id":2534,"date":"2024-11-19T19:03:52","date_gmt":"2024-11-19T19:03:52","guid":{"rendered":"https:\/\/cmaengineers.com\/stage\/?p=2534"},"modified":"2024-11-20T14:56:43","modified_gmt":"2024-11-20T14:56:43","slug":"south-manchester-rail-trail-is-open","status":"publish","type":"post","link":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/","title":{"rendered":"South Manchester Rail Trail is Open"},"content":{"rendered":"<p>Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail.\u00a0 CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The creation of the South Manchester Rail Trail will serve as a safe accessible link to businesses, parks, ponds, brooks, and other assets to the City of Manchester, its citizens, and the surrounding communities.<\/p>\n<p>It took years of planning and construction for this short section, which features the dramatic and historic Cohas Brook Trestle. The wooden trestle, the highest on the Granite State Rail Trail, was built in the 1850s and rebuilt in 1932. Hidden in the woods and forgotten since the last train passed over it in 1989, the abandoned trestle\u2019s restoration posed both design and construction challenges.\u00a0 At 153 feet long and 41 feet high, the restored trestle is sure to become a favorite along the trail.<\/p>\n<p><iframe loading=\"lazy\" title=\"Once hidden trestle in Manchester to become part of Granite State Rail Trail\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/K5IbOd1STgY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail.\u00a0 CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":2526,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","footnotes":"","_links_to":"","_links_to_target":""},"categories":[16],"tags":[],"class_list":["post-2534","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","entry","one-third"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The\" \/>\n\t<meta name=\"robots\" content=\"noindex, nofollow, max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kevin Johannen\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"CMA Engineers - Pursue Excellence\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"South Manchester Rail Trail is Open - CMA Engineers\" \/>\n\t\t<meta property=\"og:description\" content=\"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-11-19T19:03:52+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-11-20T14:56:43+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"South Manchester Rail Trail is Open - CMA Engineers\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#blogposting\",\"name\":\"South Manchester Rail Trail is Open - CMA Engineers\",\"headline\":\"South Manchester Rail Trail is Open\",\"author\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/author\\\/iknow\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/South-Manchester-Rail-Trail-1.jpg\",\"width\":1600,\"height\":1200},\"datePublished\":\"2024-11-19T19:03:52+00:00\",\"dateModified\":\"2024-11-20T14:56:43+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#webpage\"},\"articleSection\":\"News\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/category\\\/news\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/category\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#listItem\",\"name\":\"South Manchester Rail Trail is Open\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#listItem\",\"position\":3,\"name\":\"South Manchester Rail Trail is Open\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#organization\",\"name\":\"CMA Engineers\",\"description\":\"Pursue Excellence\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/\",\"telephone\":\"+16034316196\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/wp-content\\\/uploads\\\/2018\\\/01\\\/CMA-small-logo.png\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#organizationLogo\",\"width\":85,\"height\":59},\"image\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/linkedin.com\\\/company\\\/cma-engineers-inc.\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/author\\\/iknow\\\/#author\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/author\\\/iknow\\\/\",\"name\":\"Kevin Johannen\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dc02b0385b0ebc0da157566a2ea04f263b7fcdcda195fccbf6252d182fe15b0c?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Kevin Johannen\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#webpage\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/\",\"name\":\"South Manchester Rail Trail is Open - CMA Engineers\",\"description\":\"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/author\\\/iknow\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/author\\\/iknow\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/South-Manchester-Rail-Trail-1.jpg\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#mainImage\",\"width\":1600,\"height\":1200},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/south-manchester-rail-trail-is-open\\\/#mainImage\"},\"datePublished\":\"2024-11-19T19:03:52+00:00\",\"dateModified\":\"2024-11-20T14:56:43+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#website\",\"url\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/\",\"name\":\"CMA Engineers\",\"description\":\"Pursue Excellence\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/cmaengineers.com\\\/stage\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"South Manchester Rail Trail is Open - CMA Engineers","description":"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The","canonical_url":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/","robots":"noindex, nofollow, max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#blogposting","name":"South Manchester Rail Trail is Open - CMA Engineers","headline":"South Manchester Rail Trail is Open","author":{"@id":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/#author"},"publisher":{"@id":"https:\/\/cmaengineers.com\/stage\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/05\/South-Manchester-Rail-Trail-1.jpg","width":1600,"height":1200},"datePublished":"2024-11-19T19:03:52+00:00","dateModified":"2024-11-20T14:56:43+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#webpage"},"isPartOf":{"@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#webpage"},"articleSection":"News"},{"@type":"BreadcrumbList","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/#listItem","position":1,"name":"Home","item":"https:\/\/cmaengineers.com\/stage\/","nextItem":{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/category\/news\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/category\/news\/#listItem","position":2,"name":"News","item":"https:\/\/cmaengineers.com\/stage\/category\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#listItem","name":"South Manchester Rail Trail is Open"},"previousItem":{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#listItem","position":3,"name":"South Manchester Rail Trail is Open","previousItem":{"@type":"ListItem","@id":"https:\/\/cmaengineers.com\/stage\/category\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/cmaengineers.com\/stage\/#organization","name":"CMA Engineers","description":"Pursue Excellence","url":"https:\/\/cmaengineers.com\/stage\/","telephone":"+16034316196","logo":{"@type":"ImageObject","url":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2018\/01\/CMA-small-logo.png","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#organizationLogo","width":85,"height":59},"image":{"@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#organizationLogo"},"sameAs":["https:\/\/linkedin.com\/company\/cma-engineers-inc."]},{"@type":"Person","@id":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/#author","url":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/","name":"Kevin Johannen","image":{"@type":"ImageObject","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/dc02b0385b0ebc0da157566a2ea04f263b7fcdcda195fccbf6252d182fe15b0c?s=96&d=mm&r=g","width":96,"height":96,"caption":"Kevin Johannen"}},{"@type":"WebPage","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#webpage","url":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/","name":"South Manchester Rail Trail is Open - CMA Engineers","description":"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/cmaengineers.com\/stage\/#website"},"breadcrumb":{"@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#breadcrumblist"},"author":{"@id":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/#author"},"creator":{"@id":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/05\/South-Manchester-Rail-Trail-1.jpg","@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#mainImage","width":1600,"height":1200},"primaryImageOfPage":{"@id":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/#mainImage"},"datePublished":"2024-11-19T19:03:52+00:00","dateModified":"2024-11-20T14:56:43+00:00"},{"@type":"WebSite","@id":"https:\/\/cmaengineers.com\/stage\/#website","url":"https:\/\/cmaengineers.com\/stage\/","name":"CMA Engineers","description":"Pursue Excellence","inLanguage":"en-US","publisher":{"@id":"https:\/\/cmaengineers.com\/stage\/#organization"}}]},"og:locale":"en_US","og:site_name":"CMA Engineers - Pursue Excellence","og:type":"article","og:title":"South Manchester Rail Trail is Open - CMA Engineers","og:description":"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The","og:url":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/","og:image":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png","og:image:secure_url":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png","article:published_time":"2024-11-19T19:03:52+00:00","article:modified_time":"2024-11-20T14:56:43+00:00","twitter:card":"summary_large_image","twitter:title":"South Manchester Rail Trail is Open - CMA Engineers","twitter:description":"Jason Beaudet, PE and Jodie Bray Strickland, PE attended the ribbon cutting ceremony for the official opening for the 1-mile section of the Granite State Rail Trail. CMA Engineers provided construction oversight and contract administration on the pedestrian trail (designed by VHB) along the former Manchester-Lawrence rail corridor between Gold Street and Perimeter Road. The","twitter:image":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/11\/blue-logo.png"},"aioseo_meta_data":{"post_id":"2534","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-11-19 19:03:52","updated":"2025-06-06 06:56:03","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/cmaengineers.com\/stage\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/cmaengineers.com\/stage\/category\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSouth Manchester Rail Trail is Open\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/cmaengineers.com\/stage\/"},{"label":"News","link":"https:\/\/cmaengineers.com\/stage\/category\/news\/"},{"label":"South Manchester Rail Trail is Open","link":"https:\/\/cmaengineers.com\/stage\/south-manchester-rail-trail-is-open\/"}],"featured_image_src":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/05\/South-Manchester-Rail-Trail-1-600x400.jpg","featured_image_src_square":"https:\/\/cmaengineers.com\/stage\/wp-content\/uploads\/2024\/05\/South-Manchester-Rail-Trail-1-600x600.jpg","author_info":{"display_name":"Kevin Johannen","author_link":"https:\/\/cmaengineers.com\/stage\/author\/iknow\/"},"_links":{"self":[{"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/posts\/2534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/comments?post=2534"}],"version-history":[{"count":4,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/posts\/2534\/revisions"}],"predecessor-version":[{"id":2538,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/posts\/2534\/revisions\/2538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/media\/2526"}],"wp:attachment":[{"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/media?parent=2534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/categories?post=2534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cmaengineers.com\/stage\/wp-json\/wp\/v2\/tags?post=2534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}